Hydrology for Geothermal Project

Posted June 25th, 2008 by Bryan in Drafting

This is a couple of drawings I did for a large geothermal AC project. These are the actual gama log drawings with the well screen depths for the drilling contractor.

No Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URL

Leave a comment

You must be logged in to post a comment.

  •  

    d30_4156 the-first-pit butterflies Spider d30_4186 Roots img_5610 img_5756 img_5654